
Standby generator for a factory
A set sized to the loads that must stay on during an outage, then commissioned on site.
View job
Daytime solar that can live with a generator when the evening load rises.
Power & Electrical · Central Uganda
Institution
The roof, the daytime load, and the existing set were surveyed together. Panels and inverter were sized to actual use so the generator only covers what solar cannot.
After commissioning the site had a team that knows both systems, not two separate contractors.

A set sized to the loads that must stay on during an outage, then commissioned on site.
View job
Pump, pipe, and application designed so the last line still gets water.
View job
Implements specified for the crop, the soil, and the people who will run them.
View job